Route Studies and Schematic
Design
For this study ETSI
estimated the travel demand on a 9-mile long new freeway facility in rural
northwest Laredo. The study area covered FM 1472, IH 35, the existing Loop 20
and the Laredo Outer Loop. Included in this study was the estimation of the
accident reduction rates caused by the construction of the new freeway and
capacity and level of service analyses at key intersections. A financial
feasibility study was also conducted which included the life cycle costs and a
benefit cost analysis.
Client: TxDOT Laredo District
|