





|
Traffic Signal Design
For this TxDOT project at Loop 499
in Harlingen, ETSI
developed traffic signal plans, specifications and cost estimates for 3
intersections. The work included field investigations, design of wheelchair
ramps as per ADA standards and crosswalk configurations. Traffic signal timing
and coordination plans were also prepared as a part of this project.
 |
 |
| Client: TxDOT Pharr District
|
|